Rio2 Launches 33,870-Metre Condestable Drilling, Suspends Fenix Gold Work

โดย Simply Wall St·PECL·Read original
Summary · why it matters

Rio2 Limited launched a two-phase surface drilling and district-scale exploration program at its Condestable Copper Mine in Peru while suspending drilling at the Fenix Gold Mine in Chile, according to a September 2026 company-wide exploration update. The Condestable campaign covers 33,870 metres across two phases and is designed to better understand and potentially convert both breccia-hosted and vein-hosted copper-gold-silver mineralization based on a refined geological model. The program sits on top of the August 2026 approval of the MEIA modification for Condestable, which supports expansion to 10,000 tonnes per day and dry stack tailings. Rio2 said the Fenix suspension stemmed from adverse weather, safety concerns and contractor standby costs, leaving extreme weather as the key near-term operational risk. The company's narrative projects $691.3 million in revenue and $250.6 million in earnings by 2029, requiring 59.3% yearly revenue growth and roughly a $192 million earnings increase from $58.2 million today.

Impact on assets 3

Critical Materials & Supply Chain▲ · 2 stocks
Others▲ · 1 stocks
⛏Copper Futures
COPPER
▲ PositiveSupplyrelevance

Rio2's 33,870-metre drilling at Condestable and MEIA-backed expansion to 10,000 tpd signal potential future copper supply growth

Theme Impact 2

Off-coverage companies 1

Rio2 LimitedPrivate▲ Positive
Supplyrelevance

Rio2 launched a two-phase 33,870-metre drilling program at Condestable to expand copper-gold-silver resources

Related news

Colombia
3

Aris Mining Completes Soto Norte ESIA, Begins Colombia Community Engagement

Aris Mining has completed the Environmental and Social Impact Assessment for its Soto Norte gold-copper project in Santander, Colombia, and in 2026 began formal community engagement across three municipalities ahead of submitting the ESIA and environmental license application. The company said Soto Norte lies outside the Santurbán Páramo and its buffer zone, and it aligned the ESIA and consultation process with Colombia's regulatory framework and the Escazú Agreement. The milestone follows the ANM's July 29, 2026 approval of the modified technical mine plan for Soto Norte, which confirmed regulators have reviewed the project's geology, reserves and mine design but does not replace the need for an environmental license before construction or mining can begin. Aris Mining's narrative projects $2.2 billion revenue and $688.8 million earnings by 2029, requiring 19.9% yearly revenue growth and a $404.1 million earnings increase from $284.7 million today, with a CA$41.53 fair value implying 66% upside. Some of the lowest estimate analysts had assumed about US$2.0 billion of revenue and US$797.7 million of earnings by 2029 while still citing Soto Norte's lengthy permitting and heavy ESG commitments as reasons for caution.
About megatrends
Critical Materials & Supply Chain › Gold ▲Regulation
Critical Materials & Supply Chain › Copper Mining & Concentrate Regulation
Critical Materials & Supply Chain › Precious Metals Regulation
Critical Materials & Supply Chain › Copper Regulation
ARIS · Regulation · Positive Aris Mining completed the Soto Norte ESIA and began formal community engagement, advancing the project toward the required environmental license under Colombia's regulatory framework.
Read original ↗
Simply Wall St·2hRead more →
ArgentinaAustralia
▲

BHP Unit Wins El Seguro Copper Exploration Contract in Argentina

Impulsa Mendoza has awarded Public Tender No. 2/2026 to Cerro Quebrado S.A., a BHP Group company, granting it an exploration contract with a purchase option for the El Seguro copper project in Argentina's Malargüe Western Mining District. The award gives BHP a second route into the district alongside its alliance with Kobrea Exploration, deepening its copper exploration exposure in a single emerging Andean jurisdiction. The contract sits alongside BHP's recent production and guidance updates, in which copper output in FY2026 fell 3% year on year to 1,952.8 kt and 2027 copper guidance was set below 2026 levels. BHP's narrative projects $56.1 billion in revenue and $13.3 billion in earnings by 2029, with a fair value of A$61.02, while some of the lowest ranked analysts assumed revenue would fall to about US$52.5 billion by 2029 even as earnings rose to roughly US$11.7 billion.
About megatrends
Critical Materials & Supply Chain › Copper Supply
Critical Materials & Supply Chain › Copper Mining & Concentrate ▲Supply
BHP.LSE · Supply · Positive BHP's Cerro Quebrado unit won the El Seguro copper exploration contract with a purchase option, expanding its copper resource base in Argentina
Cerro Quebrado S.A. · Supply · Positive Cerro Quebrado S.A., a BHP company, was awarded the El Seguro copper exploration contract with a purchase option
COPPER · Supply · Positive BHP's new copper exploration contract in Argentina signals potential future copper supply growth
Read original ↗
Simply Wall St·10hRead more →
Canada

Purecore Metals Announces Up to C$2.5 Million Non-Brokered Private Placement

Purecore Metals Inc. intends to complete a non-brokered private placement for aggregate gross proceeds of up to C$2,500,000, the company announced on October 2, 2026. The offering will combine hard dollar units priced at C$1.35 each and flow-through units priced at C$1.50 each, with each unit consisting of one common share and one warrant. Each warrant entitles the holder to acquire one warrant share at C$2.00 for 36 months from the applicable closing date, subject to acceleration if the closing price on the Canadian Securities Exchange equals or exceeds C$2.50 for ten consecutive trading days. Net proceeds from the hard dollar units are expected to fund mineral exploration, property expenditures and acquisitions, and general corporate and working capital purposes, while gross proceeds allocated to the flow-through shares will be used to incur eligible Canadian exploration expenses that the company intends to renounce to subscribers with an effective date no later than December 31, 2026. Completion remains subject to customary closing conditions and regulatory approvals, and all securities issued will be subject to a four-month hold period.
About megatrends
Energy Transition & Power Demand › Uranium Mining & Development Capital
Critical Materials & Supply Chain › Copper Mining & Concentrate Capital
Critical Materials & Supply Chain › Nickel & Cobalt Mining Capital
Read original ↗
GlobeNewswire·1dRead more →